An IDDP-2 Flow Test Kick of Meeting was conducted in Reykjavik, 12th August 2019, and is reported in SAGA Report No. 12. According to this report the flow test was expected to begin early September – but due to unforeseen intervention the beginning of flow test...
A significant milestone has been reached in the Iceland Deep Drilling Project at the Reykjanes Peninsula in Iceland when drilling of the IDDP-2 well was completed on the 25th of January at 4,659 meters depth. All of the initial targets were reached. These targets...
Drilling has progressed slowly but steady for the last few weeks. Since 3200 m depth we have been drilling without getting any return of circulation fluid or drill cuttings to the surface. Seven times we have attempted to drill for spot cores, providing us with...
The RN-15/IDDP-2 has reached 3.640 m depth and is now the deepest hole in Iceland. The well is cased with a 9 5/8 inch steel casing to 2.940 m, and after cementing the casing the well was deepened with 8 ½ inch rotary drill bit. While drilling below the casing, quite...